  "_notes": "Each entry groups goals by the energy source section they appear under in the 2022 SEP (electricity / naturalGas / gasoline / diesel / communityIncentives). Goal/Strategy/Action numbering is preserved verbatim from the source (e.g. a source typo duplicating 'STRATEGY 2.1' twice under Water Resources Goal 2 is corrected to 2.1/2.2 here, noted inline). statusUpdate2025 is null with dataGap:true where the 2025 Progress Report did not address that specific goal.",
  "departments": [
    {
      "id": "water-resources",
      "name": "Water Resources Department",
      "energySource": "electricity",
      "profile2019": {
        "pctOfCityElectricity": 49,
        "demandMW": 16,
        "usageMWh": 68496.885,
        "expenseUsd": 4400000,
        "citation": {
          "source": "sep2022",
          "page": 36
        }
      },
      "progress2025": {
        "preliminaryUsageMWh": 69845,
        "pctChangeVs2019": 2.0,
        "wrongDirection": true,
        "note": "Increase since 2019, against a 40% reduction target for 2025.",
        "citation": {
          "source": "progress2025",
          "page": 12
        }
      },
      "goals": [
        {
          "number": 1,
          "id": "WR-G1",
          "text": "Reduce water demand by 20% per capita by 2030.",
          "evaluationMethod": "Track yearly water usage and normalize per capita. Compare to previous year normalized water usage for change in usage. Usage per capita should drop by an average of at least 1% yearly.",
          "citation": {
            "source": "sep2022",
            "page": [
              36,
              72
            ]
          },
          "strategies": [
            {
              "number": "1.1",
              "text": "Water efficiency campaign.",
              "actions": [
                {
                  "id": "A1.1.1",
                  "text": "Audit all City buildings for water efficiency opportunities."
                },
                {
                  "id": "A1.1.2",
                  "text": "Audit and fix distribution leaks."
                },
                {
                  "id": "A1.1.3",
                  "text": "Educate citizens on the importance of water conservation."
                },
                {
                  "id": "A1.1.4",
                  "text": "Develop incentives for citizens to reduce personal water demand."
                },
                {
                  "id": "A1.1.5",
                  "text": "Establish funding to assist vulnerable residents to reduce water demand."
                },
                {
                  "id": "A1.1.6",
                  "text": "Perform a study of other cities' water pricing structures."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false
          },
          "statusHistory": [
            {
              "year": 2026,
              "status": "2025 measure published",
              "statusNote": "Official operational measure; not enough information to calculate the SEP's per-capita target.",
              "text": "Greensboro's official Water Conservation page reports average daily system water demand of 33.7 million gallons per day in 2025. A matching service-population denominator and comparable baseline are still required before per-capita progress can be calculated.",
              "citation": {
                "sourceType": "external",
                "publisher": "City of Greensboro, Water Resources",
                "title": "Water Conservation",
                "url": "https://www.greensboro-nc.gov/departments/water-resources/water-conservation",
                "retrievedDate": "2026-08-04",
                "note": "Supports the 2025 system-demand observation only; it does not establish per-capita progress or goal completion."
              }
            }
          ]
        },
        {
          "number": 2,
          "id": "WR-G2",
          "text": "Reduce electricity demand by 40% by 2025 from 2007.",
          "evaluationMethod": "Track and report electricity consumption in kWh at the end of each year and compare to previous year for change in usage.",
          "citation": {
            "source": "sep2022",
            "page": [
              36,
              72
            ]
          },
          "strategies": [
            {
              "number": "2.1",
              "text": "Increase equipment efficiency.",
              "actions": [
                {
                  "id": "A2.1.1",
                  "text": "Audit water and wastewater equipment."
                },
                {
                  "id": "A2.1.2",
                  "text": "Implement efficiency measures suggested by audit."
                },
                {
                  "id": "A2.1.3",
                  "text": "Monitor equipment to ensure efficiency levels are met."
                }
              ]
            },
            {
              "number": "2.2",
              "sourceLabelNote": "Printed in source as 'STRATEGY 2.1' a second time; action IDs (A2.2.x) make clear this is Strategy 2.2.",
              "text": "Increase equipment efficiency (J. Edward Kitchen Operations Center).",
              "actions": [
                {
                  "id": "A2.2.1",
                  "text": "Perform an energy audit on J. Edward Kitchen Operations Center."
                },
                {
                  "id": "A2.2.2",
                  "text": "Implement efficiency measures suggested by audit."
                },
                {
                  "id": "A2.2.3",
                  "text": "Monitor buildings to ensure efficiency levels are met."
                }
              ]
            }
          ],
          "statusUpdate2025": {
            "status": null,
            "statusNote": "Unlike most other goals in this dataset, the 2025 Progress Report describes activity for this goal (GSO WaterWise Portal, kit distribution) without attaching one of its usual status words (Complete/Ongoing/In Progress/Initiated). Reported with no explicit status label — represent this as its own state in the UI, not silently mapped to 'Ongoing'.",
            "text": "Preliminary figures put electricity use by the Water Resources Department at 69,845 MWh in 2025, a 2.0% increase since 2019. In May, the department introduced the GSO WaterWise Portal, supported by the City's system-wide upgrade to smart meters, offering customized usage alerts, near real-time water use data, and personalized conservation tips.",
            "launchedMay2025": "GSO WaterWise Portal",
            "correspondingPrioritizedAction": 24,
            "citation": {
              "source": "progress2025",
              "page": 12
            }
          },
          "fundingLink": {
            "hasActiveFunding": true,
            "linkedTo": "funding.json > grants > eecbg-2024",
            "note": "EECBG funds the water/energy conservation kit outreach program distributed via GSO WaterWise."
          },
          "statusHistory": [
            {
              "year": 2023,
              "status": "Ongoing",
              "text": "The Water Resources Department prepared an engineering study of its water and wastewater equipment (completed 2021); replacement of equipment is now prioritized based on the study's energy efficiency measurements.",
              "citation": {
                "source": "progress2023",
                "page": 16
              }
            },
            {
              "year": 2024,
              "status": "Ongoing",
              "text": "The Water Resources Department finalized its Electrical System Evaluation and Preliminary Engineering Report, replaced three motor control centers, and added a new power feeder from the main substation at the T.Z. Osborne Wastewater Reclamation Facility. Two outdated emergency generators are being replaced.",
              "citation": {
                "source": "progress2024",
                "page": 17
              }
            }
          ]
        },
        {
          "number": 3,
          "id": "WR-G3",
          "text": "Meet total demand with renewable energy by 2040.",
          "evaluationMethod": "Track and report the amount of electricity generated by renewable sources for Water Resources.",
          "citation": {
            "source": "sep2022",
            "page": [
              36,
              72
            ]
          },
          "strategies": [
            {
              "number": "3.1",
              "text": "Install 1 MW ground PV solar project at T. Z. Osborne.",
              "actions": [
                {
                  "id": "A3.1.1",
                  "text": "Secure funding for project."
                },
                {
                  "id": "A3.1.2",
                  "text": "RFP developed/bids secured/contract awarded."
                }
              ]
            },
            {
              "number": "3.2",
              "text": "Install additional ground solar.",
              "actions": [
                {
                  "id": "A3.2.1",
                  "text": "Identify suitable land for array (5 acres for a 1 MW array)."
                },
                {
                  "id": "A3.2.2",
                  "text": "Identify suitable land for smaller arrays (>1MW)."
                },
                {
                  "id": "A3.2.3",
                  "text": "Conduct feasibility study of solar installation on existing parking decks."
                }
              ]
            },
            {
              "number": "3.3",
              "text": "Inline hydroelectric project.",
              "actions": [
                {
                  "id": "A3.3.1",
                  "text": "Determine cost effectiveness of the project."
                },
                {
                  "id": "A3.3.2",
                  "text": "Investigate and resolve previously identified federal permitting issues."
                },
                {
                  "id": "A3.3.3",
                  "text": "If A3.3.1 is positive, RFP developed/bids secured/contract awarded."
                }
              ]
            },
            {
              "number": "3.4",
              "text": "Research electricity generation by capturing waste heat from bio-solid incineration.",
              "actions": [
                {
                  "id": "A3.4.1",
                  "text": "Feasibility study to determine compatibility with existing equipment."
                },
                {
                  "id": "A3.4.2",
                  "text": "Determine cost effectiveness of the project if A3.4.1 is positive."
                },
                {
                  "id": "A3.4.3",
                  "text": "If A3.4.2 is positive, RFP developed/bids secured/contract awarded."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false
          },
          "statusHistory": [
            {
              "year": 2015,
              "status": "Authorized",
              "statusNote": "Pre-SEP authorization milestone; construction or operation has not been established.",
              "text": "City Council authorized a lease agreement with Sustainable Energy Community Development Corporation for a T.Z. Osborne Water Reclamation Plant solar project (Legistar ID 15-0794; Matter 2699; passed October 5, 2015). The record establishes authorization only; later evidence is still needed to determine whether the project was executed, constructed, cancelled, superseded, or replaced.",
              "citation": {
                "sourceType": "external",
                "publisher": "City of Greensboro / Legistar",
                "title": "Resolution Authorizing a Lease Agreement with the Sustainable Energy Community Development Corporation for the T. Z. Osborne Water Reclamation Plant Solar Project",
                "legistarFileId": "15-0794",
                "url": "https://webapi.legistar.com/v1/greensboro/matters/2699",
                "retrievedDate": "2026-08-04",
                "note": "Matter metadata confirms authorization and passed date; it does not confirm project delivery."
              }
            }
          ],
          "relatedExternalFinding": {
            "text": "Neither SEP document mentions it, but a City-owned-land renewable asset roughly 5x larger than this goal's own 1 MW T.Z. Osborne proposal (Strategy 3.1, never built) was actually constructed elsewhere in the City during this same window: a 4.8 MW solar array at the White Street Landfill, operational since October 2020. It's just attributed to a different department (Field Operations / Solid Waste & Recycling), not Water Resources — the SEP's department-siloed accounting has no mechanism to credit it here.",
            "framingNote": "Stated factually, not as an accusation: this is a gap in the reports' own department-based accounting structure, not evidence Water Resources underperformed relative to what it controls.",
            "seeAlso": "departments.json > white-street-landfill",
            "citation": {
              "sourceType": "external",
              "publisher": "City of Greensboro / Legistar",
              "title": "White Street Landfill Solar Facility (Legistar File 15-0607)",
              "url": "https://greensboro.legistar.com/LegislationDetail.aspx?FullText=1&GUID=C926F147-37D0-4B19-B389-E10BE804A2DD&ID=2376081",
              "retrievedDate": "2026-07-14",
              "note": "Not referenced in either SEP source document — found via independent research."
            }
          }
        }
      ]
    },
    {
      "id": "transportation-electricity",
      "name": "Transportation Department (Electricity)",
      "energySource": "electricity",
      "profile2019": {
        "pctOfCityElectricity": 18,
        "demandMW": 1.5,
        "usageMWh": 25411.039,
        "expenseUsd": 3200000,
        "citation": {
          "source": "sep2022",
          "page": 38
        }
      },
      "note2025Reorg": "The Greensboro Transit Agency (GTA) was a division of the Transportation Department (GDOT) until 2023, when it became a separate department. 2025 progress figures below are reported as 'Transportation & Transit Departments' combined, which limits direct comparability to the 2019 baseline (which predates the GTA split).",
      "progress2025": {
        "preliminaryUsageMWh": 7409,
        "pctChangeVs2019": -70.8,
        "note": "Combined Transportation & Transit electricity use; decline is partly a reporting-boundary effect of the 2023 GTA split, not purely efficiency gains.",
        "citation": {
          "source": "progress2025",
          "page": 12
        }
      },
      "goals": [
        {
          "number": 1,
          "id": "TR-E-G1",
          "text": "Increase LED streetlamp conversion by 5% per year.",
          "evaluationMethod": "Track and report the increase in streetlamps converted to LEDs at the end of each year.",
          "citation": {
            "source": "sep2022",
            "page": [
              38,
              72
            ]
          },
          "strategies": [
            {
              "number": "1.1",
              "text": "Increase the conversion of street lighting to LED.",
              "actions": [
                {
                  "id": "A1.1.1",
                  "text": "Work with Duke Energy to ensure conversion meets the yearly goal."
                }
              ]
            }
          ],
          "statusUpdate2025": {
            "status": "Ongoing",
            "text": "GDOT works with Duke Energy to coordinate LED conversion of the company's more than 27,400 streetlamps and other public outdoor lighting units. LED streetlamp conversion data for 2025 (percent converted) was not available for inclusion in this report. However, total energy consumption by streetlamps dropped from 18,276 MWh in 2022 to 1,952 MWh in 2025 — a reduction of 89.3%.",
            "dataGapNote": "2025 LED conversion percentage explicitly stated as unavailable in the source report — a self-acknowledged gap.",
            "cscUpdate2026": {
              "date": "2026-07-13",
              "text": "At the CSC's July 2026 meeting, OSR staff cited the conversion pace as roughly 5.2% per year for the plan's first two years and said the City is still waiting on Duke Energy for an update covering the past year. The pace figure matches OSR's own previously reported 2019–2024 average (see ledConversionTimeSeries below) — no material change — but confirms the 2025 data-gap flagged in the Progress Report was still unresolved as of mid-2026.",
              "citation": {
                "sourceType": "external",
                "publisher": "City of Greensboro / Community Sustainability Council",
                "title": "CSC Meeting Minutes, July 13, 2026",
                "url": "https://www.greensboro-nc.gov/departments/office-of-sustainability-and-resilience/community-sustainability-council-csc",
                "retrievedDate": "2026-07-22"
              }
            },
            "streetlampEnergyMWh2022": 18276,
            "streetlampEnergyMWh2025": 1952,
            "streetlampEnergyChangePct": -89.3,
            "streetlampBaselineYearNote": "This comparison uses 2022 as the baseline, not 2019 — different reference year than the SEP's 2007/2019 baselines.",
            "correspondingPrioritizedAction": 21,
            "citation": {
              "source": "progress2025",
              "page": 12
            }
          },
          "fundingLink": {
            "hasActiveFunding": false,
            "note": "Duke Energy-driven infrastructure conversion; no named City grant or contract identified in the source."
          },
          "ledConversionTimeSeries": {
            "unit": "% of ~27,400 City streetlamps converted to LED",
            "note": "Closes the gap the 2025 Progress Report explicitly flagged as unavailable — found in the 2024 report instead.",
            "series": [
              {
                "year": 2019,
                "pctLed": 15.2,
                "ledCount": 4039
              },
              {
                "year": 2021,
                "pctLed": 33.0,
                "ledCount": 9005
              },
              {
                "year": 2023,
                "pctLed": 39.7,
                "ledCount": 10851
              },
              {
                "year": 2024,
                "pctLed": 41.2,
                "ledCount": 11295
              }
            ],
            "avgAnnualPaceNote": "OSR's own stated average pace: 5.2% per year (2019-2024).",
            "citation": {
              "source": "progress2024",
              "page": 17
            }
          },
          "statusHistory": [
            {
              "year": 2023,
              "status": "Ongoing",
              "text": "As of October 2023, 39.6% of all lamps used LEDs, up from 15.2% in 2019 (avg. pace 6.1%/year).",
              "citation": {
                "source": "progress2023",
                "page": 16
              }
            },
            {
              "year": 2024,
              "status": "Ongoing",
              "text": "As of December 2024, 41.2% converted, up from 15.2% in 2019 (avg. pace 5.2%/year).",
              "citation": {
                "source": "progress2024",
                "page": 17
              }
            },
            {
              "year": 2026,
              "status": "Ongoing",
              "text": "At the CSC's July 2026 meeting, OSR cited the conversion pace as roughly 5.2%/year for the plan's first two years — matching the 2024 report's own average — and said the City is still waiting on Duke Energy for a 2025 update. Confirms the 2025 data-gap flagged above was still open as of mid-2026.",
              "citation": {
                "sourceType": "external",
                "publisher": "City of Greensboro / Community Sustainability Council",
                "title": "CSC Meeting Minutes, July 13, 2026",
                "url": "https://www.greensboro-nc.gov/departments/office-of-sustainability-and-resilience/community-sustainability-council-csc",
                "retrievedDate": "2026-07-22"
              }
            }
          ]
        },
        {
          "number": 2,
          "id": "TR-E-G2",
          "text": "Reduce electricity demand by 40% by 2025 from 2007.",
          "evaluationMethod": "Track and report electricity consumption in kWh at the end of each year and compare to previous year for change in usage.",
          "citation": {
            "source": "sep2022",
            "page": [
              38,
              72
            ]
          },
          "strategies": [
            {
              "number": "2.1",
              "text": "Increase building energy efficiency.",
              "actions": [
                {
                  "id": "A2.1.1",
                  "text": "Perform an energy audit on Transportation buildings."
                },
                {
                  "id": "A2.1.2",
                  "text": "Implement efficiency measures suggested by audit."
                },
                {
                  "id": "A2.1.3",
                  "text": "Monitor buildings to ensure efficiency levels are met."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false
          }
        },
        {
          "number": 3,
          "id": "TR-E-G3",
          "text": "Meet total electricity demand with renewable energy by 2040.",
          "evaluationMethod": "Track and report the amount of electricity generated by renewable sources for Transportation Department.",
          "citation": {
            "source": "sep2022",
            "page": [
              38,
              72
            ]
          },
          "strategies": [
            {
              "number": "3.1",
              "text": "Examine the feasibility of rooftop solar on department's buildings.",
              "actions": [
                {
                  "id": "A3.1.1",
                  "text": "Establish feasibility study project in future budget."
                },
                {
                  "id": "A3.1.2",
                  "text": "Prepare and issue RFP, award contract for feasibility study."
                }
              ]
            },
            {
              "number": "3.2",
              "text": "Evaluate rooftop canopy for parking decks.",
              "actions": [
                {
                  "id": "A3.2.1",
                  "text": "Determine if existing parking decks can structurally support solar."
                },
                {
                  "id": "A3.2.2",
                  "text": "Conduct feasibility study of solar installation on existing parking decks."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false
          }
        }
      ]
    },
    {
      "id": "coliseum",
      "name": "Greensboro Coliseum Complex",
      "energySource": "electricity",
      "profile2019": {
        "pctOfCityElectricity": 12,
        "demandMW": 2.4,
        "usageMWh": 16805.791,
        "expenseUsd": 1200000,
        "citation": {
          "source": "sep2022",
          "page": 40
        }
      },
      "progress2025": null,
      "progress2025DataGap": true,
      "progress2025GapNote": "The 2025 Progress Report does not include a status update for the Coliseum Complex's electricity goals.",
      "goals": [
        {
          "number": 1,
          "id": "COL-G1",
          "text": "Reduce electricity demand by 40% by 2025 from 2007.",
          "evaluationMethod": "Track and report electricity consumption in kWh at the end of each year and compare to previous year for change in usage.",
          "citation": {
            "source": "sep2022",
            "page": [
              40,
              72
            ]
          },
          "strategies": [
            {
              "number": "1.1",
              "text": "Increase building energy efficiency.",
              "actions": [
                {
                  "id": "A1.1.1",
                  "text": "Perform an energy audit on Coliseum Complex buildings."
                },
                {
                  "id": "A1.1.2",
                  "text": "Implement efficiency measures suggested by audit."
                },
                {
                  "id": "A1.1.3",
                  "text": "Monitor buildings to ensure efficiency levels are met."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false
          }
        },
        {
          "number": 2,
          "id": "COL-G2",
          "text": "Meet total electricity demand with renewable energy by 2040.",
          "evaluationMethod": "Track and report the amount of electricity generated by renewable sources.",
          "citation": {
            "source": "sep2022",
            "page": [
              40,
              72
            ]
          },
          "strategies": [
            {
              "number": "2.1",
              "text": "Evaluate rooftop solar options.",
              "actions": [
                {
                  "id": "A2.1.1",
                  "text": "Review existing engineering reports/contract report."
                },
                {
                  "id": "A2.1.2",
                  "text": "Contract scope development for projects."
                },
                {
                  "id": "A2.1.3",
                  "text": "RFP/Proposals."
                }
              ]
            },
            {
              "number": "2.2",
              "text": "Add a green fee to parking fees, to fund energy efficiency and renewable energy projects.",
              "actions": [
                {
                  "id": "A2.2.1",
                  "text": "Investigate green fee as an option."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false
          }
        }
      ]
    },
    {
      "id": "buildings-ei",
      "name": "Buildings Managed by Engineering & Inspections",
      "energySource": "electricity",
      "note": "This is a functional 'Buildings' use-type grouping (32% of total City electricity, per Table 3/Figure 5) covering City buildings across many departments — distinct from the tiny 'Engineering & Inspections' department line item in Table 3 (266,700 kWh, its own office usage only). Do not conflate the two when charting.",
      "profile2019": {
        "pctOfCityElectricityByUseType": 32,
        "demandMW": 5.35,
        "expenseUsd": 2400000,
        "citation": {
          "source": "sep2022",
          "page": 42
        }
      },
      "progress2025": {
        "preliminaryUsageMWh": 45576,
        "pctChangeVs2019": 1.0,
        "wrongDirection": true,
        "note": "Increase since 2019, against a 40% reduction target for 2025.",
        "citation": {
          "source": "progress2025",
          "page": 13
        }
      },
      "goals": [
        {
          "number": 1,
          "id": "EI-G1",
          "text": "Reduce electricity demand by 40% by 2025 from 2007.",
          "evaluationMethod": "Track and report electricity consumption in kWh at the end of each year and compare to previous year for change in usage.",
          "citation": {
            "source": "sep2022",
            "page": [
              42,
              72
            ]
          },
          "strategies": [
            {
              "number": "1.1",
              "text": "Increase building energy efficiency (1st Tier buildings).",
              "actions": [
                {
                  "id": "A1.1.1",
                  "text": "Perform energy audits on buildings."
                },
                {
                  "id": "A1.1.2",
                  "text": "Implement efficiency measures suggested by audit."
                },
                {
                  "id": "A1.1.3",
                  "text": "Monitor equipment to ensure efficiency levels are met."
                }
              ]
            },
            {
              "number": "1.2",
              "text": "Increase building energy efficiency (2nd Tier buildings).",
              "actions": [
                {
                  "id": "A1.2.1",
                  "text": "Perform energy audits on buildings."
                },
                {
                  "id": "A1.2.2",
                  "text": "Implement efficiency measures suggested by audit."
                },
                {
                  "id": "A1.2.3",
                  "text": "Monitor equipment to ensure efficiency levels are met."
                }
              ]
            }
          ],
          "statusUpdate2025": {
            "status": "In Progress",
            "text": "Preliminary figures put total electricity use in the City's buildings at 45,576 MWh in 2025, a 1.0% increase since 2019. OSR contracted with Systems Contractors, Inc. (SCI) to audit the City's 10-highest energy-using buildings and recommend energy conservation measures. Level 1 audits identified needed maintenance and corrective measures; SCI suggested more-detailed Level 2 audits. OSR is working to carry out these projects and identify needed funding. In October, OSR encouraged staff to coordinate major energy-consuming activities with Duke Energy's non-summer, seasonal time-of-use electricity rates.",
            "correspondingPrioritizedAction": 2,
            "citation": {
              "source": "progress2025",
              "page": 13
            },
            "cscUpdate2026": {
              "date": "2026-07-13",
              "text": "OSR's July 2026 CSC presentation described the SCI Level 1 audits on the 10 least-efficient buildings as fully completed, with some resulting upgrades expected to follow shortly — a slightly more advanced status than the 2025 Progress Report's 'OSR is working to carry out these projects and identify needed funding,' consistent with normal progress in the months since that report's February 2026 publication rather than a contradiction.",
              "citation": {
                "sourceType": "external",
                "publisher": "City of Greensboro / Community Sustainability Council",
                "title": "CSC Meeting Minutes, July 13, 2026",
                "url": "https://www.greensboro-nc.gov/departments/office-of-sustainability-and-resilience/community-sustainability-council-csc",
                "retrievedDate": "2026-07-22"
              }
            }
          },
          "fundingLink": {
            "hasActiveFunding": true,
            "linkedTo": "funding.json > contracts > sci-building-audit-2025",
            "note": "SCI's Level 1/2 building audits are the named contract behind this goal's 2025 progress."
          },
          "buildingLogiX": {
            "note": "The City contracted BuildingLogiX, an energy sub-metering system, installed in City buildings in October 2024, allowing real-time electricity monitoring in the 10 largest City buildings.",
            "citation": {
              "source": "progress2024",
              "page": 14
            }
          },
          "statusHistory": [
            {
              "year": 2023,
              "status": "Initiated",
              "text": "The OSR developed an RFP for contractors to provide energy audits and recommendations for energy conservation measures in the City's largest energy-consuming buildings, in compliance with ASHRAE standards, including MWBE Office participation.",
              "citation": {
                "source": "progress2023",
                "page": 17
              }
            },
            {
              "year": 2024,
              "status": "In Progress",
              "text": "The OSR contracted with a vendor to provide energy audits in select City buildings. Ten buildings were studied in 2024, with more planned for 2025.",
              "citation": {
                "source": "progress2024",
                "page": 18
              }
            },
            {
              "year": 2026,
              "status": "In Progress",
              "text": "OSR's July 2026 CSC presentation described the SCI Level 1 audits on the 10 least-efficient buildings as fully completed, with some resulting upgrades expected to follow shortly — a modest advance on the 2025 Progress Report's 'OSR is working to carry out these projects and identify needed funding.'",
              "citation": {
                "sourceType": "external",
                "publisher": "City of Greensboro / Community Sustainability Council",
                "title": "CSC Meeting Minutes, July 13, 2026",
                "url": "https://www.greensboro-nc.gov/departments/office-of-sustainability-and-resilience/community-sustainability-council-csc",
                "retrievedDate": "2026-07-22"
              }
            }
          ]
        },
        {
          "number": 2,
          "id": "EI-G2",
          "text": "Meet total demand with renewable energy by 2040.",
          "evaluationMethod": "Track and report the amount of electricity generated by renewable sources.",
          "citation": {
            "source": "sep2022",
            "page": [
              42,
              72
            ]
          },
          "strategies": [
            {
              "number": "2.1",
              "text": "Evaluate solar for Tier 1 roofs.",
              "actions": [
                {
                  "id": "A2.1.1",
                  "text": "Review existing engineering reports/contract report."
                },
                {
                  "id": "A2.1.2",
                  "text": "RFP/Proposals."
                },
                {
                  "id": "A2.1.3",
                  "text": "Evaluate REC and/or Offset purchase options."
                }
              ]
            },
            {
              "number": "2.2",
              "text": "Purchase Renewable Energy Certificates (RECs) and Offsets.",
              "actions": [
                {
                  "id": "A2.2.1",
                  "text": "Evaluate REC and/or Offset purchase options."
                }
              ]
            }
          ],
          "statusUpdate2025": {
            "status": "In Progress",
            "text": "The Central Library's new roof was installed in 2025. OSR is identifying funding to execute the needed maintenance and corrective measures identified through the library's Level 1 building energy audit.",
            "correspondingPrioritizedAction": 15,
            "citation": {
              "source": "progress2025",
              "page": 15
            }
          },
          "fundingLink": {
            "hasActiveFunding": true,
            "linkedTo": "funding.json > contracts > sci-building-audit-2025",
            "note": "The cited Level 1 building energy audit is SCI's; the roof installation itself is not tied to a named funding source in the source documents (OSR is 'identifying funding' for remaining corrective measures)."
          }
        }
      ]
    },
    {
      "id": "coliseum-natural-gas",
      "name": "Greensboro Coliseum Complex",
      "energySource": "naturalGas",
      "profile2019": {
        "thermsUsed": 319313,
        "costUsd": 257552,
        "pctOfCityNaturalGas": 34,
        "citation": {
          "source": "sep2022",
          "page": 44
        }
      },
      "progress2025": null,
      "progress2025DataGap": true,
      "goals": [
        {
          "number": 1,
          "id": "COL-NG-G1",
          "text": "Reduce natural gas demand by 40% by 2030 from 2007.",
          "evaluationMethod": "Track and report energy consumption in therms at the end of each year and compare to previous year for change in usage.",
          "citation": {
            "source": "sep2022",
            "page": [
              44,
              73
            ]
          },
          "strategies": [
            {
              "number": "1.1",
              "text": "Increase building energy efficiency.",
              "actions": [
                {
                  "id": "A1.1.1",
                  "text": "Perform an energy audit on Coliseum Complex buildings."
                },
                {
                  "id": "A1.1.2",
                  "text": "Implement efficiency measures suggested by audit."
                },
                {
                  "id": "A1.1.3",
                  "text": "Monitor buildings to ensure efficiency levels are met."
                }
              ]
            },
            {
              "number": "1.2",
              "text": "Increase heating system efficiency.",
              "actions": [
                {
                  "id": "A1.2.1",
                  "text": "Evaluate heating system to determine level of efficiency."
                },
                {
                  "id": "A1.2.2",
                  "text": "Implement efficiency measures suggested by evaluation."
                },
                {
                  "id": "A1.2.3",
                  "text": "Monitor equipment to ensure efficiency levels are met."
                }
              ]
            },
            {
              "number": "1.3",
              "text": "Convert natural gas systems to electric.",
              "actions": [
                {
                  "id": "A1.3.1",
                  "text": "Replace natural gas equipment with electric at end of life."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false
          },
          "deprioritizedInSource": {
            "value": true,
            "note": "The 2022 SEP explicitly states natural gas 'will not be considered an early priority action at the City level' (it's 7% of citywide GHG emissions vs. electricity's 60%). This goal's lack of 2025 reporting and funding is consistent with a documented deprioritization, not an unexplained gap.",
            "citation": {
              "source": "sep2022",
              "page": 44
            }
          }
        }
      ]
    },
    {
      "id": "parks-rec-natural-gas",
      "name": "Parks and Recreation",
      "energySource": "naturalGas",
      "profile2019": {
        "thermsUsed": 134773,
        "costUsd": 124987,
        "pctOfCityNaturalGas": 14,
        "citation": {
          "source": "sep2022",
          "page": 45
        }
      },
      "progress2025": null,
      "progress2025DataGap": true,
      "goals": [
        {
          "number": 1,
          "id": "PR-NG-G1",
          "text": "Reduce natural gas demand by 40% by 2030 from 2007.",
          "evaluationMethod": "Track and report energy consumption in therms at the end of each year and compare to previous year for change in usage.",
          "citation": {
            "source": "sep2022",
            "page": [
              45,
              73
            ]
          },
          "strategies": [
            {
              "number": "1.1",
              "text": "Increase building energy efficiency.",
              "actions": [
                {
                  "id": "A1.1.1",
                  "text": "Perform an energy audit on all buildings."
                },
                {
                  "id": "A1.1.2",
                  "text": "Implement efficiency measures suggested by audit."
                },
                {
                  "id": "A1.1.3",
                  "text": "Monitor buildings to ensure efficiency levels are met."
                }
              ]
            },
            {
              "number": "1.2",
              "text": "Increase heating system efficiency.",
              "actions": [
                {
                  "id": "A1.2.1",
                  "text": "Evaluate heating system to determine level of efficiency."
                },
                {
                  "id": "A1.2.2",
                  "text": "Implement efficiency measures suggested by evaluation."
                },
                {
                  "id": "A1.2.3",
                  "text": "Monitor equipment to ensure efficiency levels are met."
                }
              ]
            },
            {
              "number": "1.3",
              "text": "Convert natural gas systems to electric.",
              "actions": [
                {
                  "id": "A1.3.1",
                  "text": "Replace natural gas equipment with electric at end of life."
                }
              ]
            },
            {
              "number": "1.4",
              "text": "Evaluate swimming pool heating.",
              "actions": [
                {
                  "id": "A1.4.1",
                  "text": "Audit facilities for increased energy efficiency measures."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false
          },
          "deprioritizedInSource": {
            "value": true,
            "note": "The 2022 SEP explicitly states natural gas 'will not be considered an early priority action at the City level' (it's 7% of citywide GHG emissions vs. electricity's 60%). This goal's lack of 2025 reporting and funding is consistent with a documented deprioritization, not an unexplained gap.",
            "citation": {
              "source": "sep2022",
              "page": 44
            }
          }
        }
      ]
    },
    {
      "id": "fire-natural-gas",
      "name": "Fire Department",
      "energySource": "naturalGas",
      "profile2019": {
        "thermsUsed": 73255,
        "costUsd": 68173,
        "pctOfCityNaturalGas": 8,
        "citation": {
          "source": "sep2022",
          "page": 45
        }
      },
      "progress2025": null,
      "progress2025DataGap": true,
      "goals": [
        {
          "number": 1,
          "id": "FIRE-NG-G1",
          "text": "Reduce natural gas demand by 40% by 2030 from 2007.",
          "evaluationMethod": "Track and report energy consumption in therms at the end of each year and compare to previous year for change in usage.",
          "citation": {
            "source": "sep2022",
            "page": [
              45,
              73
            ]
          },
          "strategies": [
            {
              "number": "1.1",
              "text": "Increase building energy efficiency.",
              "actions": [
                {
                  "id": "A1.1.1",
                  "text": "Perform an energy audit on all buildings."
                },
                {
                  "id": "A1.1.2",
                  "text": "Implement efficiency measures suggested by audit."
                },
                {
                  "id": "A1.1.3",
                  "text": "Monitor buildings to ensure efficiency levels are met."
                }
              ]
            },
            {
              "number": "1.2",
              "text": "Increase heating system efficiency.",
              "actions": [
                {
                  "id": "A1.2.1",
                  "text": "Evaluate heating system to determine level of efficiency."
                },
                {
                  "id": "A1.2.2",
                  "text": "Implement efficiency measures suggested by evaluation."
                },
                {
                  "id": "A1.2.3",
                  "text": "Monitor equipment to ensure efficiency levels are met."
                }
              ]
            },
            {
              "number": "1.3",
              "text": "Convert natural gas systems to electric.",
              "actions": [
                {
                  "id": "A1.3.1",
                  "text": "Replace natural gas equipment with electric at end of life."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false
          },
          "deprioritizedInSource": {
            "value": true,
            "note": "The 2022 SEP explicitly states natural gas 'will not be considered an early priority action at the City level' (it's 7% of citywide GHG emissions vs. electricity's 60%). This goal's lack of 2025 reporting and funding is consistent with a documented deprioritization, not an unexplained gap.",
            "citation": {
              "source": "sep2022",
              "page": 44
            }
          }
        },
        {
          "number": 2,
          "id": "FIRE-NG-G2",
          "text": "Meet water heating demand with renewable energy by 2040.",
          "evaluationMethod": "Track and report the amount of heated water generated by renewable sources.",
          "citation": {
            "source": "sep2022",
            "page": [
              45,
              73
            ]
          },
          "strategies": [
            {
              "number": "2.1",
              "text": "Rooftop thermal solar.",
              "actions": [
                {
                  "id": "A2.1.1",
                  "text": "Continue installation of solar for hot water."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false
          },
          "deprioritizedInSource": {
            "value": true,
            "note": "The 2022 SEP explicitly states natural gas 'will not be considered an early priority action at the City level' (it's 7% of citywide GHG emissions vs. electricity's 60%). This goal's lack of 2025 reporting and funding is consistent with a documented deprioritization, not an unexplained gap.",
            "citation": {
              "source": "sep2022",
              "page": 44
            }
          },
          "note": "The SEP notes 11 of the City's fire stations already had solar thermal arrays as of 2022."
        }
      ]
    },
    {
      "id": "police-gasoline",
      "name": "Police Department",
      "energySource": "gasoline",
      "profile2019": {
        "pctOfCityGasolineEmissions": 49,
        "gallonsUsed": 576207,
        "costUsd": 1295042,
        "citation": {
          "source": "sep2022",
          "page": 47
        }
      },
      "progress2025": null,
      "goals": [
        {
          "number": 1,
          "id": "POL-G1",
          "text": "Reduce gasoline consumption by 5% per year.",
          "evaluationMethod": "Track and report gasoline consumption in gallons at the end of each year and compare to previous year for change in usage.",
          "citation": {
            "source": "sep2022",
            "page": [
              47,
              73
            ]
          },
          "strategies": [
            {
              "number": "1.1",
              "text": "Fleet conversion to hybrid vehicles.",
              "actions": [
                {
                  "id": "A1.1.1",
                  "text": "Purchase hybrids for replacement patrol cars."
                },
                {
                  "id": "A1.1.2",
                  "text": "Purchase hybrids for replacement non-patrol vehicles."
                },
                {
                  "id": "A1.1.3",
                  "text": "Explore hybrid options for leased replacement."
                },
                {
                  "id": "A1.1.4",
                  "text": "Hire fleet technicians with hybrid/EV experience."
                }
              ]
            },
            {
              "number": "1.2",
              "text": "Fleet conversion to electric vehicles.",
              "actions": [
                {
                  "id": "A1.2.1",
                  "text": "Purchase EVs when cost is comparable to hybrid."
                },
                {
                  "id": "A1.2.2",
                  "text": "Explore transition of Prisoner Transport, CSI and Evidence vans to EVs."
                },
                {
                  "id": "A1.2.3",
                  "text": "Budget for charging stations to meet needs of increased EV fleet."
                },
                {
                  "id": "A1.2.4",
                  "text": "Explore cost associated with charging stations at Swing Road."
                },
                {
                  "id": "A1.2.5",
                  "text": "Explore potential grant funding opportunities."
                },
                {
                  "id": "A1.2.6",
                  "text": "Hire fleet technicians with EV experience."
                }
              ]
            },
            {
              "number": "1.3",
              "text": "Increase the number of bicycles used for patrol.",
              "actions": [
                {
                  "id": "A1.3.1",
                  "text": "Explore opportunities to increase bicycle patrol."
                }
              ]
            }
          ],
          "statusUpdate2025": {
            "status": "In Progress",
            "text": "The Police Department purchased 32 new, hybrid Ford Explorer Interceptors to replace existing internal combustion vehicles, and intends to replace its prisoner transport van with an electric vehicle (EV). OSR staff works with the Equipment Services Division to identify opportunities to replace the least-efficient vehicles with hybrid or EV models where practical.",
            "citation": {
              "source": "progress2025",
              "page": 13
            }
          },
          "fundingLink": {
            "hasActiveFunding": false,
            "note": "Vehicle purchases described as routine fleet replacement via Equipment Services Division; no named grant or contract stated in the source."
          },
          "statusHistory": [
            {
              "year": 2023,
              "status": "Initiated",
              "text": "Staff from the OSR, Equipment Services Division, and Transportation Department attended the Electrify the South workshop to learn about EV fleet transition strategies and resources.",
              "citation": {
                "source": "progress2023",
                "page": 17
              }
            },
            {
              "year": 2024,
              "status": "In Progress",
              "text": "The Police Department ordered two hybrid Ford Mavericks to replace existing Chevrolet Equinoxes, and is seeking an EV model to replace its prisoner transport van.",
              "citation": {
                "source": "progress2024",
                "page": 18
              }
            },
            {
              "year": 2026,
              "status": "In Progress",
              "text": "At the CSC's July 2026 meeting, OSR staff disclosed that Police Department data did not make it into the City's fleet/telematics study (a 100-vehicle, 7-department pilot with Samsara — see progress-2025-misc.json > telematicsPilot). Police accounts for roughly half of citywide gasoline use, so its absence is a material coverage gap in the study meant to inform fleet reduction goals like this one, not previously stated in either Progress Report.",
              "citation": {
                "sourceType": "external",
                "publisher": "City of Greensboro / Community Sustainability Council",
                "title": "CSC Meeting Minutes, July 13, 2026",
                "url": "https://www.greensboro-nc.gov/departments/office-of-sustainability-and-resilience/community-sustainability-council-csc",
                "retrievedDate": "2026-07-22"
              }
            }
          ]
        },
        {
          "number": 2,
          "id": "POL-G2",
          "text": "Right-size fleet to ensure all leased vehicles are necessary.",
          "evaluationMethod": "A fleet optimization study is completed.",
          "citation": {
            "source": "sep2022",
            "page": [
              47,
              73
            ]
          },
          "strategies": [
            {
              "number": "2.1",
              "text": "Review and justify all vehicles.",
              "actions": [
                {
                  "id": "A2.1.1",
                  "text": "Conduct a fleet optimization study."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false
          }
        }
      ]
    },
    {
      "id": "transportation-gasoline",
      "name": "Transportation Department (Gasoline)",
      "energySource": "gasoline",
      "profile2019": {
        "pctOfCityGasolineEmissions": 31,
        "gallonsUsed": 371682,
        "costUsd": 669708,
        "citation": {
          "source": "sep2022",
          "page": 48
        }
      },
      "progress2025": null,
      "progress2025DataGap": true,
      "goals": [
        {
          "number": 1,
          "id": "TR-GAS-G1",
          "text": "Reduce gasoline consumption by 5% per year.",
          "evaluationMethod": "Track and report gasoline consumption in gallons at the end of each year and compare to previous year for change in usage.",
          "citation": {
            "source": "sep2022",
            "page": [
              48,
              73
            ]
          },
          "strategies": [
            {
              "number": "1.1",
              "text": "Fleet conversion to electric vehicles.",
              "actions": [
                {
                  "id": "A1.1.1",
                  "text": "Purchase electric vehicles when cost is comparable to hybrid."
                },
                {
                  "id": "A1.1.2",
                  "text": "Budget for charging stations to meet needs of increased EV fleet."
                }
              ]
            },
            {
              "number": "1.2",
              "text": "Fleet conversion to hybrid vehicles.",
              "actions": [
                {
                  "id": "A1.2.1",
                  "text": "Purchase hybrid for replacement vehicles."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false
          },
          "statusHistory": [
            {
              "year": 2023,
              "status": "Initiated",
              "text": "Staff from the OSR, Fleet and Equipment Services Division, and Transportation Department acquired informational case studies and discussed strategies and resources available to local governments for transitioning to electric and hybrid vehicles.",
              "citation": {
                "source": "progress2023",
                "page": 19
              }
            },
            {
              "year": 2024,
              "status": "Initiated",
              "citation": {
                "source": "progress2024",
                "page": 19
              }
            }
          ],
          "wentSilent": {
            "value": true,
            "note": "This goal showed real activity in both the 2023 and 2024 Annual Progress Reports (status: Initiated in each), then received no update at all in the 2025 report — a confirmed two-year-then-silence pattern, distinct from a goal that was never reported on and distinct from the natural-gas goals the SEP itself deprioritized. Nothing in the source documents says this work stopped or was deprioritized; it simply stopped being mentioned.",
            "lastReportedYear": 2024,
            "lastReportedStatus": "Initiated"
          }
        }
      ]
    },
    {
      "id": "field-operations-diesel",
      "name": "Field Operations Department",
      "energySource": "diesel",
      "profile2019": {
        "pctOfCityDieselEmissions": 47,
        "gallonsUsed": 698569,
        "costUsd": 1458121,
        "citation": {
          "source": "sep2022",
          "page": 50
        }
      },
      "progress2025": null,
      "progress2025Note": "No goal-specific 2025 status update. The City-wide telematics pilot (100 vehicles, 7 departments incl. Field Operations) is relevant cross-cutting context — see progress-2025-misc.json.",
      "goals": [
        {
          "number": 1,
          "id": "FO-G1",
          "text": "Reduce diesel consumption by 5% per year.",
          "evaluationMethod": "Track and report gasoline consumption in gallons at the end of each year and compare to previous year for change in usage.",
          "evaluationMethodSourceNote": "Source text says 'gasoline' here, likely a copy/paste artifact — the goal itself is about diesel.",
          "citation": {
            "source": "sep2022",
            "page": [
              50,
              74
            ]
          },
          "strategies": [
            {
              "number": "1.1",
              "text": "Right-size fleet/equipment.",
              "actions": [
                {
                  "id": "A1.1.1",
                  "text": "Review inventory of fleet/equipment."
                },
                {
                  "id": "A1.1.2",
                  "text": "Only replace or eliminate if justified."
                }
              ]
            },
            {
              "number": "1.2",
              "text": "Fleet conversion to hybrid vehicles.",
              "actions": [
                {
                  "id": "A1.2.1",
                  "text": "Purchase hybrids for replacement vehicles."
                },
                {
                  "id": "A1.2.2",
                  "text": "Focus on replacing the most fuel inefficient first."
                }
              ]
            },
            {
              "number": "1.3",
              "text": "Fleet conversion to electric vehicles.",
              "actions": [
                {
                  "id": "A1.3.1",
                  "text": "Replace fleet vehicles with EVs of a justifiable cost and performance."
                },
                {
                  "id": "A1.3.2",
                  "text": "Focus on replacing the most fuel inefficient first."
                }
              ]
            },
            {
              "number": "1.4",
              "text": "Equipment conversion to electric equivalent.",
              "actions": [
                {
                  "id": "A1.4.1",
                  "text": "Replace equipment at retirement with electric or hybrid models of a justifiable cost and performance."
                },
                {
                  "id": "A1.4.2",
                  "text": "Focus on replacing the most fuel inefficient first."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": false,
            "note": "The City-wide EECBG-funded telematics pilot spans 7 departments, but the source does not name which departments — cannot confirm Field Operations is among them, so no funding link is asserted here."
          },
          "statusHistory": [
            {
              "year": 2023,
              "status": "Initiated",
              "citation": {
                "source": "progress2023",
                "page": 18
              }
            },
            {
              "year": 2024,
              "status": "Initiated",
              "citation": {
                "source": "progress2024",
                "page": 19
              }
            }
          ],
          "wentSilent": {
            "value": true,
            "note": "This goal showed real activity in both the 2023 and 2024 Annual Progress Reports (status: Initiated in each), then received no update at all in the 2025 report — a confirmed two-year-then-silence pattern, distinct from a goal that was never reported on and distinct from the natural-gas goals the SEP itself deprioritized. Nothing in the source documents says this work stopped or was deprioritized; it simply stopped being mentioned.",
            "lastReportedYear": 2024,
            "lastReportedStatus": "Initiated"
          },
          "departmentRenameNote": "Already referred to as 'Solid Waste & Recycling Department' in the 2023 Progress Report (published March 2024) — earlier than this site's prior assumption that the rename was 'as of the 2025 report.' The rename appears to predate or coincide with the 2023 reporting period, not the 2025 one."
        }
      ]
    },
    {
      "id": "transportation-diesel",
      "name": "Transportation Department (Diesel)",
      "energySource": "diesel",
      "profile2019": {
        "pctOfCityDieselEmissions": 33,
        "gallonsUsed": 487153,
        "costUsd": 1013120,
        "citation": {
          "source": "sep2022",
          "page": 51
        }
      },
      "note2025Reorg": "GTA split from GDOT in 2023. The 2025 status update below is reported under 'Transportation & Transit Departments' and executed by GTA.",
      "goals": [
        {
          "number": 1,
          "id": "TR-D-G1",
          "text": "Reduce diesel consumption by 5% per year.",
          "evaluationMethod": "Track and report gasoline consumption in gallons at the end of each year and compare to previous year for change in usage.",
          "evaluationMethodSourceNote": "Source text says 'gasoline' here, likely a copy/paste artifact — the goal itself is about diesel.",
          "citation": {
            "source": "sep2022",
            "page": [
              51,
              74
            ]
          },
          "strategies": [
            {
              "number": "1.1",
              "text": "Right-size fleet/equipment.",
              "actions": [
                {
                  "id": "A1.1.1",
                  "text": "Review inventory of fleet/equipment."
                },
                {
                  "id": "A1.1.2",
                  "text": "Only replace or eliminate if justified."
                }
              ]
            },
            {
              "number": "1.2",
              "text": "Fleet conversion to hybrid vehicles.",
              "actions": [
                {
                  "id": "A1.2.1",
                  "text": "Purchase hybrids for replacement vehicles."
                },
                {
                  "id": "A1.2.2",
                  "text": "Focus on replacing the most fuel inefficient first."
                }
              ]
            },
            {
              "number": "1.3",
              "text": "Fleet conversion to electric vehicles.",
              "actions": [
                {
                  "id": "A1.3.1",
                  "text": "Replace fleet vehicles with EVs of a justifiable cost and performance."
                },
                {
                  "id": "A1.3.2",
                  "text": "Focus on replacing the most fuel inefficient first."
                }
              ]
            },
            {
              "number": "1.4",
              "text": "Support implementation of GTA Mobility Greensboro 2040 Plan to increase ridership throughout the City.",
              "actions": [
                {
                  "id": "A1.4.1",
                  "text": "Identify opportunities to support the implementation of the plan to increase ridership."
                }
              ]
            }
          ],
          "statusUpdate2025": {
            "status": "In Progress",
            "text": "Implementation of GTA's zero-emissions fleet transition plan is in progress. GTA purchased three new, Gillig battery-electric buses (one 40-foot model and two 35-foot models) and two new 60-kilowatt Heliox portable chargers, anticipated to help reduce annual diesel consumption.",
            "citation": {
              "source": "progress2025",
              "page": 14
            }
          },
          "fundingLink": {
            "hasActiveFunding": true,
            "correctedInStep3": true,
            "correctionNote": "Step 2 marked this goal unfunded because neither SEP PDF names a funding source for GTA's bus/charger purchases. Independent research (Step 3) found five real, externally-verified grants dating back to 2016 funding this fleet — this was a data-layer gap in the source documents, not an absence of funding.",
            "linkedTo": [
              "funding.json > externalGrants > grants > fta-low-no-2024",
              "funding.json > externalGrants > grants > fta-low-no-2018",
              "funding.json > externalGrants > grants > duke-energy-ev-charging-2016",
              "funding.json > externalGrants > grants > vw-settlement-2021",
              "funding.json > externalGrants > grants > fta-fy23-competitive"
            ],
            "note": "Most significant: the $22.4M FTA Low-No grant (July 2024) is publicly credited by Greensboro's Transit Director to the 2022 Strategic Energy Plan — see funding.json > externalGrants > grants > fta-low-no-2024 > quote. All five citations are sourceType:'external' — none of this funding history appears in either SEP source document."
          },
          "statusHistory": [
            {
              "year": 2023,
              "status": "Initiated",
              "text": "Greensboro Transit Agency (GTA), managed by the Transit Department, completed a zero-emissions fleet transition plan. GTA was also developing a new long-range transit plan, GoBORO, to help achieve the City's car-optional-by-2045 goal.",
              "citation": {
                "source": "progress2023",
                "page": 19
              }
            },
            {
              "year": 2024,
              "status": "In Progress",
              "text": "In late 2024, GTA and Transportation staff completed the GoBORO transit mobility study, recommending significant route/frequency changes. The City's first 15-minute-service route, CrossMax Purple, launched March 2024 and averages 10,000 riders/week — a ~54% ridership increase over the routes it replaced.",
              "citation": {
                "source": "progress2024",
                "page": 20
              }
            }
          ]
        }
      ]
    },
    {
      "id": "community-incentives",
      "name": "Community Incentives (City-wide, not department-specific)",
      "energySource": "communityIncentives",
      "goals": [
        {
          "number": 1,
          "id": "CI-G1",
          "text": "Incentivize Greensboro residents and businesses to achieve similar progress on GHG reduction, energy efficiency, and renewable energy use as the City.",
          "evaluationMethod": "Track and report all efforts by the City to incentivize residents to achieve similar progress on GHG reduction, energy efficiency, and renewable energy use.",
          "citation": {
            "source": "sep2022",
            "page": [
              52,
              74
            ]
          },
          "strategies": [
            {
              "number": "1.1",
              "text": "Energy efficiency educational outreach.",
              "actions": [
                {
                  "id": "A1.1.1",
                  "text": "Communications & Marketing Department to create energy efficiency educational materials and distribute them through City channels."
                },
                {
                  "id": "A1.1.2",
                  "text": "Arts & Culture Program to develop a contest for creating a product out of common city waste/byproducts."
                }
              ]
            },
            {
              "number": "1.2",
              "text": "Remove obstacles to clean, renewable energy installation, and energy-efficiency projects.",
              "actions": [
                {
                  "id": "A1.2.1",
                  "text": "Review land use ordinances and building permit policies for obstacles."
                },
                {
                  "id": "A1.2.2",
                  "text": "Advocate for homeowner associations to make Bylaw changes to rooftop solar."
                },
                {
                  "id": "A1.2.3",
                  "text": "Obtain SolSmart Designation."
                }
              ]
            },
            {
              "number": "1.3",
              "text": "Encourage community solar.",
              "actions": [
                {
                  "id": "A1.3.1",
                  "text": "Explore opportunities to support community solar demonstration projects."
                }
              ]
            }
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "fundingLink": {
            "hasActiveFunding": true,
            "linkedTo": "funding.json > grants > eecbg-2024",
            "note": "Corrected from an earlier 'no funding' assessment — the 2024 Progress Report explicitly ties the EECBG grant to this goal."
          },
          "statusHistory": [
            {
              "year": 2023,
              "status": "Initiated",
              "text": "The OSR submitted a proposal for funding through the US Department of Energy's Energy Efficiency and Conservation Block Grant program. At least 40 percent of the benefits of proposed projects will flow to disadvantaged communities.",
              "citation": {
                "source": "progress2023",
                "page": 15
              }
            },
            {
              "year": 2024,
              "status": "Initiated",
              "text": "The OSR received $314,150 in December 2024 from the DOE EECBG Program, funding (beginning 2025): a comprehensive fleet efficiency study and transition plan, a water and energy conservation outreach program, a study to select candidate buildings for net-zero upgrades, and a comprehensive GHG inventory. Separately, Housing & Neighborhood Development's Weatherization Assistance Program and Duke Energy Carolinas' High Energy Usage Pilot Program collaborated on client referrals/repairs, including replacing old heating systems with mini-split heat pumps in the 59-unit Southwoods multi-family housing rehabilitation project.",
              "citation": {
                "source": "progress2024",
                "page": 20
              }
            },
            {
              "year": 2026,
              "status": "Active program confirmed",
              "text": "The City continued offering free household water and energy conservation kits through a collaboration between the Office of Sustainability and Resilience and Water Resources. The kits are funded by the U.S. Department of Energy Energy Efficiency and Conservation Block Grant and distributed through GSO WaterWise while supplies last.",
              "citation": {
                "sourceType": "external",
                "publisher": "City of Greensboro, Office of Sustainability and Resilience",
                "title": "Water & Energy Conservation",
                "url": "https://www.greensboro-nc.gov/departments/office-of-sustainability-and-resilience/sustainability-programs/water-energy-conservation",
                "retrievedDate": "2026-08-04",
                "note": "Confirms continued program activity in 2026; does not establish participation totals or overall goal completion."
              }
            }
          ],
          "wentSilent": {
            "value": false,
            "note": "The 2025 Annual Progress Report omitted this goal, but a current official City program page confirms in 2026 that the EECBG-funded water and energy conservation kit program remains active. The reporting gap remains historically visible, but the work is no longer classified as silent.",
            "lastReportedYear": 2024,
            "lastReportedStatus": "Initiated",
            "externalActivityConfirmedYear": 2026
          }
        },
        {
          "number": 2,
          "id": "CI-G2",
          "text": "Address cost burdens to ensure a just transition to renewable energy for all and prioritize at-risk populations.",
          "evaluationMethod": "Track and report all efforts by the City to address cost burdens to ensure a just transition to renewable energy for all and prioritize at-risk populations.",
          "citation": {
            "source": "sep2022",
            "page": [
              52,
              74
            ]
          },
          "strategies": [
            {
              "number": "2.1",
              "text": "Assist lower-wealth citizens in reducing water and electricity demand.",
              "actions": [
                {
                  "id": "A2.1.1",
                  "text": "Establish funding to assist citizens in reducing utility demand."
                },
                {
                  "id": "A2.1.2",
                  "text": "Funding to provide high efficiency toilets, showerheads, appliances, insulation, etc."
                },
                {
                  "id": "A2.1.3",
                  "text": "Collaborate with GTCC to create a Train/Work program for retrofits."
                },
                {
                  "id": "A2.1.4",
                  "text": "Housing & Neighborhood Development to develop and run education program."
                }
              ]
            }
          ],
          "additionalRecommendedActions": [
            "Economic Development & Business Services Office (EDBS) - collaborate with the Nussbaum Center for Entrepreneurship to incubate new local green businesses.",
            "EDBS - offer economic development assistance grants/forgivable loans to green businesses relocating to, or expanding in, Greensboro.",
            "EDBS - offer grants/forgivable loans to businesses that implement energy saving or emissions reducing improvements to their facilities.",
            "Housing and Neighborhood Development Department - offer grants/forgivable loans to low- and moderate-income homeowners and affordable housing property owners who implement energy saving or emissions reducing improvements.",
            "Sustainability Office - collaborate with Libraries to organize an annual Neighborhood Sustainability Challenge Program.",
            "Sustainability Office - establish funding and collaborate with CSC to formally launch the Greensboro Responsible Business Awards Program."
          ],
          "statusUpdate2025": null,
          "dataGap": true,
          "statusUpdate2025Note": "Not directly updated by number in the 2025 report, but Recommendation 3 / Strategy 3.3 (outreach to impacted/vulnerable communities via the equity prioritization tool) and the EECBG-funded water/energy conservation kits address closely related ground. See recommendations.json Recommendation 3 and departments.json Water Resources Goal 2.",
          "fundingLink": {
            "hasActiveFunding": false,
            "note": "No named grant/contract directly tied to this goal itself; adjacent EECBG-funded conservation kit work sits under Water Resources Goal 2 instead."
          }
        }
      ]
    },
    {
      "id": "white-street-landfill",
      "name": "White Street Landfill (Field Operations / Solid Waste & Recycling)",
      "energySource": "renewableGeneration",
      "externalOnly": true,
      "note": "This entry exists entirely outside the SEP's goal structure — it is not derived from either SEP source document, has no Goal/Strategy/Action numbering, and no 'goals' array. It was added because independent research (Legistar, Step 3) surfaced a real, City-related renewable energy asset with no home anywhere in the SEP's department-by-department accounting. Field Operations was renamed 'Solid Waste & Recycling' as of the 2025 Progress Report (see recommendations.json > REC-1 > status2025) — the White Street Landfill is that department's facility.",
      "crossReferencedFrom": {
        "goal": "departments.json > water-resources > WR-G3",
        "note": "See that goal's relatedExternalFinding for the framing: the SEP's own accounting treats Water Resources' renewable progress as stalled (its 1 MW T.Z. Osborne proposal never happened), while a City-related asset roughly 5x larger was built in the same window under a different department, uncredited in either report. A factual gap in department-siloed accounting, not an accusation."
      },
      "externalAssets": [
        {
          "id": "wsl-solar",
          "name": "White Street Landfill Solar Facility",
          "capacityMw": 4.8,
          "capacityConfidence": "medium — see funding.json > externallyVerifiedRenewableAssets > whiteStreetLandfillSolar > asBuilt for full confidence notes and a homes-equivalent figure discrepancy (65 vs. 650) not resolved in this research pass.",
          "acreage": "15-20 acres as authorized (2015); ~30 acres as commonly reported once built — discrepancy not resolved to a single primary source.",
          "operator": "Petra Engineering (2015 authorization) / 'ReNew Petra' (current common name) — plausibly a rebrand, not independently confirmed.",
          "operationalDate": "2020-10",
          "homesEquivalent": 65,
          "financingModel": "Land lease / independent power producer — NOT a Solar Power Purchase Agreement (City does not purchase the power; developer sells to Duke Energy directly, City receives ~$6,000/year lease rent plus a purchase option after year 7). See funding.json for the full distinction.",
          "legistarFileId": "15-0607",
          "citation": {
            "sourceType": "external",
            "publisher": "City of Greensboro / Legistar",
            "title": "Resolution Authorizing an Amendment to the White Street Landfill Gas Utilization Project Agreement with Petra Engineering to Include a Solar Facility",
            "legistarFileId": "15-0607",
            "url": "https://greensboro.legistar.com/LegislationDetail.aspx?FullText=1&GUID=C926F147-37D0-4B19-B389-E10BE804A2DD&ID=2376081",
            "retrievedDate": "2026-07-14",
            "note": "Not referenced in either SEP source document — found via independent research."
          }
        },
        {
          "id": "wsl-gas-to-energy",
          "name": "White Street Landfill Gas-to-Energy Project",
          "note": "Separate project under the same amended agreement as the solar facility; converts landfill methane to electricity.",
          "homesEquivalent": 1500,
          "homesEquivalentConfidence": "medium — see funding.json > externallyVerifiedRenewableAssets > whiteStreetLandfillGasToEnergy for confidence notes.",
          "citation": {
            "sourceType": "external",
            "publisher": "City of Greensboro (OSR 'Solar Energy Central' page, via search-result aggregation)",
            "title": "Solar Energy Central",
            "url": "https://www.greensboro-nc.gov/departments/office-of-sustainability-and-resilience/leed-for-cities/solar-energy-central",
            "retrievedDate": "2026-07-14",
            "note": "Direct fetch returned HTTP 403; figure drawn from search-engine summaries referencing this page. Not referenced in either SEP source document."
          }
        }
      ],
      "fundingLink": {
        "hasActiveFunding": true,
        "linkedTo": "funding.json > externallyVerifiedRenewableAssets",
        "note": "Privately financed (land lease / IPP model, not a City grant) — 'funded' here means the project happened and is documented, not that City grant dollars built it."
      }
    }
  ]
}